Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 11 of 12VerifiedOsprey supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Phoenix Retail Park, Stoke-on-Trent · Osprey Charging

Phoenix Retail Park, ST3 2JD · Open 24h
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 300 kW100% reliability11 of 12 available
30880-1100% reliabilityAvailable
30880-2100% reliabilityAvailable
30880-3100% reliabilityAvailable
30880-4100% reliabilityAvailable
30886-1100% reliabilityAvailable
30886-2100% reliabilityAvailable
30886-3100% reliabilityAvailable
30886-4100% reliabilityAvailable
30890-1100% reliabilityCharging
30890-2100% reliabilityAvailable
30890-3100% reliabilityAvailable
30890-4100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingCar park
PaymentCredit cardApp start/stopRFID card
Getting thereNo Parking Restrictions No Height Restriction No Customer Input Required
6am9am12pm3pm6pm9pm
From live status history · busiest around 11am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

Up to 300 kW DC via CCS.

How many charging sockets does Phoenix Retail Park, Stoke-on-Trent · Osprey Charging have?

12 charging sockets: 12 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Phoenix Retail Park, Stoke-on-Trent · Osprey Charging open 24/7?

Yes - Phoenix Retail Park, Stoke-on-Trent · Osprey Charging is open 24 hours a day, 7 days a week.

When is Phoenix Retail Park, Stoke-on-Trent · Osprey Charging busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 421 observed charging sessions.

Who operates Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

Phoenix Retail Park, Stoke-on-Trent · Osprey Charging is on the Osprey Charging network.

How long does a Tesla Model Y Long Range take to charge at Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Phoenix Retail Park, Stoke-on-Trent · Osprey Charging?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 13 Oct 2026