Morrisons, Wisbech · Osprey Charging
CHAdeMO · 50 kW96% reliability4 of 6 available
CCS · 150 kW93% reliability4 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Morrisons, Wisbech · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Morrisons, Wisbech · Osprey Charging?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Morrisons, Wisbech · Osprey Charging have?
12 charging sockets: 6 × 50 kW CHAdeMO, 6 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Morrisons, Wisbech · Osprey Charging open 24/7?
Yes - Morrisons, Wisbech · Osprey Charging is open 24 hours a day, 7 days a week.
When is Morrisons, Wisbech · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Morrisons, Wisbech · Osprey Charging?
Amp Map measured 94.8% uptime here from recorded live status over the last 30 days, across 1172 observed charging sessions.
Who operates Morrisons, Wisbech · Osprey Charging?
Morrisons, Wisbech · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Morrisons, Wisbech · Osprey Charging?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons, Wisbech · Osprey Charging?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons, Wisbech · Osprey Charging?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.