Land Oak, Kidderminster · Osprey Charging
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Land Oak, Kidderminster · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Land Oak, Kidderminster · Osprey Charging?
Up to 75 kW DC via CCS.
How many charging sockets does Land Oak, Kidderminster · Osprey Charging have?
1 charging socket: 1 × 75 kW CCS. Live per-socket availability is shown on this page.
Is Land Oak, Kidderminster · Osprey Charging open 24/7?
Yes - Land Oak, Kidderminster · Osprey Charging is open 24 hours a day, 7 days a week.
When is Land Oak, Kidderminster · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Land Oak, Kidderminster · Osprey Charging?
Amp Map measured 99.6% uptime here from recorded live status over the last 30 days, across 15 observed charging sessions.
Who operates Land Oak, Kidderminster · Osprey Charging?
Land Oak, Kidderminster · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Land Oak, Kidderminster · Osprey Charging?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Land Oak, Kidderminster · Osprey Charging?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Land Oak, Kidderminster · Osprey Charging?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.