Lamb & Flag, Abergavenny · Osprey Charging
CHAdeMO · 50 kW96% reliability3 of 3 available
CCS · 75 kW99% reliability3 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Lamb & Flag, Abergavenny · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Lamb & Flag, Abergavenny · Osprey Charging?
Up to 75 kW DC via CCS, CHAdeMO.
How many charging sockets does Lamb & Flag, Abergavenny · Osprey Charging have?
6 charging sockets: 3 × 75 kW CCS, 3 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Lamb & Flag, Abergavenny · Osprey Charging open 24/7?
Yes - Lamb & Flag, Abergavenny · Osprey Charging is open 24 hours a day, 7 days a week.
When is Lamb & Flag, Abergavenny · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Lamb & Flag, Abergavenny · Osprey Charging?
Amp Map measured 97.6% uptime here from recorded live status over the last 30 days, across 458 observed charging sessions.
Who operates Lamb & Flag, Abergavenny · Osprey Charging?
Lamb & Flag, Abergavenny · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Lamb & Flag, Abergavenny · Osprey Charging?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lamb & Flag, Abergavenny · Osprey Charging?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lamb & Flag, Abergavenny · Osprey Charging?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.