Eaton Oak, St Neots · Osprey Charging
CHAdeMO · 50 kW80% reliability3 of 6 available
CCS · 150 kW80% reliability3 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Eaton Oak, St Neots · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Eaton Oak, St Neots · Osprey Charging?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Eaton Oak, St Neots · Osprey Charging have?
12 charging sockets: 6 × 50 kW CHAdeMO, 6 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Eaton Oak, St Neots · Osprey Charging open 24/7?
Yes - Eaton Oak, St Neots · Osprey Charging is open 24 hours a day, 7 days a week.
When is Eaton Oak, St Neots · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Eaton Oak, St Neots · Osprey Charging?
Amp Map measured 79.7% uptime here from recorded live status over the last 30 days, across 678 observed charging sessions.
Who operates Eaton Oak, St Neots · Osprey Charging?
Eaton Oak, St Neots · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Eaton Oak, St Neots · Osprey Charging?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eaton Oak, St Neots · Osprey Charging?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Eaton Oak, St Neots · Osprey Charging?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.