Co-op Sizewell Road, Leiston · Osprey Charging
CCS · 150 kW100% reliability4 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Co-op Sizewell Road, Leiston · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Co-op Sizewell Road, Leiston · Osprey Charging?
Up to 150 kW DC via CCS.
How many charging sockets does Co-op Sizewell Road, Leiston · Osprey Charging have?
4 charging sockets: 4 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Co-op Sizewell Road, Leiston · Osprey Charging open 24/7?
Yes - Co-op Sizewell Road, Leiston · Osprey Charging is open 24 hours a day, 7 days a week.
When is Co-op Sizewell Road, Leiston · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Co-op Sizewell Road, Leiston · Osprey Charging?
Amp Map measured 99.6% uptime here from recorded live status over the last 30 days, across 334 observed charging sessions.
Who operates Co-op Sizewell Road, Leiston · Osprey Charging?
Co-op Sizewell Road, Leiston · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Co-op Sizewell Road, Leiston · Osprey Charging?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Sizewell Road, Leiston · Osprey Charging?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Co-op Sizewell Road, Leiston · Osprey Charging?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.