Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Aug 2022

West Way Nissan Mill Hill · Nissan UK Dealer Network

517 Watford Way, NW7 2QR
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW2 sockets
Type 27 kW2 sockets
Location info
PriceFree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesOnly available during business opening hours
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at West Way Nissan Mill Hill · Nissan UK Dealer Network?

The operator's published price is Free. Prices come from the operator's own data feed and can change.

How fast is charging at West Way Nissan Mill Hill · Nissan UK Dealer Network?

Up to 7 kW AC via Type 2.

How many charging sockets does West Way Nissan Mill Hill · Nissan UK Dealer Network have?

4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.

Who operates West Way Nissan Mill Hill · Nissan UK Dealer Network?

West Way Nissan Mill Hill · Nissan UK Dealer Network is on the Nissan UK Dealer Network network.

How long does a Tesla Model Y Long Range take to charge at West Way Nissan Mill Hill · Nissan UK Dealer Network?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West Way Nissan Mill Hill · Nissan UK Dealer Network?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at West Way Nissan Mill Hill · Nissan UK Dealer Network?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Aug 2022