Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 22 Dec 2016

Renault Nissan Alliance office · Nissan UK Dealer Network

5 Wolsey Business Park, Tolpits Lane, WD18 9BL
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW1 socket
Type 27 kW1 socket
BS1363 3 Pin 13 Amp3 kW1 socket
Location info
AccessCustomers only
NotesDBT spotted in Renault-Nissan car park. No network branding. no RFID (push-button start/stop) but connector is padlocked
Getting thereworkplace charging.
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Renault Nissan Alliance office · Nissan UK Dealer Network?

Up to 50 kW DC via CHAdeMO, Type 2, BS1363 3 Pin 13 Amp.

How many charging sockets does Renault Nissan Alliance office · Nissan UK Dealer Network have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

Who operates Renault Nissan Alliance office · Nissan UK Dealer Network?

Renault Nissan Alliance office · Nissan UK Dealer Network is on the Nissan UK Dealer Network network.

Can anyone charge at Renault Nissan Alliance office · Nissan UK Dealer Network?

The operator lists this charger for customers of the site.

How long does a Tesla Model Y Long Range take to charge at Renault Nissan Alliance office · Nissan UK Dealer Network?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Renault Nissan Alliance office · Nissan UK Dealer Network?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Renault Nissan Alliance office · Nissan UK Dealer Network?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 22 Dec 2016