Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 13 Dec 2016

Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network

Port Dundas Road, G4 0HZ
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW2 sockets
CHAdeMO50 kW1 socket
Location info
PriceFree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessCustomers only
Getting thereRestricted to dealership opening hours (9am-7pm weekdays, 9-5 Sat, 11-5 Sun)
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

The operator's published price is Free. Prices come from the operator's own data feed and can change.

How fast is charging at Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

Up to 50 kW DC via Type 2, CHAdeMO.

How many charging sockets does Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network have?

2 charging sockets: 2 × 7 kW Type 2, 1 × 50 kW CHAdeMO.

Who operates Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network is on the Nissan UK Dealer Network network.

Can anyone charge at Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

The operator lists this charger for customers of the site.

How long does a Tesla Model Y Long Range take to charge at Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Macklins Motors (Nissan) Glasgow Central · Nissan UK Dealer Network?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 13 Dec 2016