Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 4 of 6VerifiedNGH supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

NGH

Cliftonville Rd, NN1 · Open 24h
Rate this charger
Network: NGH
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW54% reliability4 of 6 available
Carpark 1 (1A)95% reliabilityAvailable
Carpark 1 (1B)96% reliabilityAvailable
Carpark 1 (2A)0% reliabilityOut of order
Carpark 1 (2B)0% reliabilityOut of order
Carpark 1 (3A)66% reliabilityAvailable
Carpark 1 (3B)63% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentApp start/stopRFID card
Getting thereSeparate parking charges apply. Error? Check emergency stop isn't pressed - twist to release.
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at NGH?

Up to 7 kW AC via Type 2.

How many charging sockets does NGH have?

6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is NGH open 24/7?

Yes - NGH is open 24 hours a day, 7 days a week.

When is NGH busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is NGH?

Amp Map measured 53.9% uptime here from recorded live status over the last 30 days, across 70 observed charging sessions.

Who operates NGH?

NGH is on the NGH network.

How long does a Tesla Model Y Long Range take to charge at NGH?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NGH?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at NGH?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: NGH · synced 13 Oct 2026