MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 20 Jul 2020
Nettle Hill
Brinklow Road, CV7 9JL
Rate this charger
Connectors
7 kW2 sockets
Location info
AccessPublic
Phone02476621899
NotesCome and enjoy our plant based cafe, 7 acres of grounds, art in the shed and mud kitchen or come and have a business meeting while charging your car
Getting thereHead up to Nettle Hill and drive round the back of the building into car park and you will find chargers on wall.
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Nettle Hill?
Up to 7 kW AC via Type 2.
How many charging sockets does Nettle Hill have?
2 charging sockets: 2 × 7 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at Nettle Hill?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nettle Hill?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nettle Hill?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 20 Jul 2020