NCP Estate
Type 2 · 11 kW71% reliability2 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at NCP Estate?
Up to 11 kW AC via Type 2.
How many charging sockets does NCP Estate have?
4 charging sockets: 4 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is NCP Estate open 24/7?
Yes - NCP Estate is open 24 hours a day, 7 days a week.
When is NCP Estate busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is NCP Estate?
Amp Map measured 71.1% uptime here from recorded live status over the last 30 days, across 16 observed charging sessions.
Who operates NCP Estate?
NCP Estate is on the NCP Estate network.
How long does a Tesla Model Y Long Range take to charge at NCP Estate?
A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NCP Estate?
A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at NCP Estate?
A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.