MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 29 Jun 2019
Nant y Ci Park and Ride
Nant-y-Ci, SA31 3RS
Rate this charger
Connectors
50 kW1 socket
43 kW1 socket
50 kW1 socket
Location info
Pricefree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
NotesCurrently on free vend while they get contactless payment equipment fitted.
Getting thereOne bay near bus stop at Park and Ride. EV charging point available 24/7
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Nant y Ci Park and Ride?
The operator's published price is free. Prices come from the operator's own data feed and can change.
How fast is charging at Nant y Ci Park and Ride?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Nant y Ci Park and Ride have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
How long does a Tesla Model Y Long Range take to charge at Nant y Ci Park and Ride?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nant y Ci Park and Ride?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nant y Ci Park and Ride?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 29 Jun 2019