MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 3 Dec 2020
N Sherwood St Parking/Charging
227 N Sherwood St, NG1 4EQ
Rate this charger
Connectors
50 kW1 socket
50 kW1 socket
43 kW1 socket
Location info
AccessPublic · membership required · access key required
NotesOutside No: 210
Getting thereParking: Free
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at N Sherwood St Parking/Charging?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does N Sherwood St Parking/Charging have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at N Sherwood St Parking/Charging?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at N Sherwood St Parking/Charging?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at N Sherwood St Parking/Charging?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 3 Dec 2020