Moore Place Hotel
Type 2 · 22 kW100% reliability4 of 4 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Moore Place Hotel?
Up to 22 kW AC via Type 2.
How many charging sockets does Moore Place Hotel have?
4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Moore Place Hotel open 24/7?
Yes - Moore Place Hotel is open 24 hours a day, 7 days a week.
When is Moore Place Hotel busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is Moore Place Hotel?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 41 observed charging sessions.
Who operates Moore Place Hotel?
Moore Place Hotel is on the Moore Place Hotel network.
How long does a Tesla Model Y Long Range take to charge at Moore Place Hotel?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Moore Place Hotel?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Moore Place Hotel?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.