Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 18 Oct 2024

College of Agriculture Food and Rural Enterprise (CAFRE) · Monta

Mullaghmeen Road, BT74 4GF
Rate this charger
Network: Monta
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCS24 kW1 socket
CHAdeMO24 kW1 socket
Location info
AccessPublic · membership required · access key required
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at College of Agriculture Food and Rural Enterprise (CAFRE) · Monta?

Up to 24 kW DC via CCS, CHAdeMO.

How many charging sockets does College of Agriculture Food and Rural Enterprise (CAFRE) · Monta have?

1 charging socket: 1 × 24 kW CCS, 1 × 24 kW CHAdeMO.

Who operates College of Agriculture Food and Rural Enterprise (CAFRE) · Monta?

College of Agriculture Food and Rural Enterprise (CAFRE) · Monta is on the Monta network.

How long does a Tesla Model Y Long Range take to charge at College of Agriculture Food and Rural Enterprise (CAFRE) · Monta?

A typical 10–80% rapid charge takes about 2h 26m on the 24 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at College of Agriculture Food and Rural Enterprise (CAFRE) · Monta?

A typical 10–80% rapid charge takes about 1h 45m on the 24 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at College of Agriculture Food and Rural Enterprise (CAFRE) · Monta?

A typical 10–80% rapid charge takes about 2h 14m on the 24 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 24 kW CCS~2h 26m
Tesla Model 3 Rear-Wheel Drive 10–80% · 24 kW CCS~1h 45m
Audi Q4 e-tron 50 10–80% · 24 kW CCS~2h 14m
Hyundai IONIQ 5 10–80% · 24 kW CCS~2h 14m
MG Motor MG4 Trophy 10–80% · 24 kW CCS~1h 52m
Hyundai Kona Electric Long Range 10–80% · 24 kW CCS~1h 47m
Nissan LEAF 10–80% · 24 kW CHAdeMO~78 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 18 Oct 2024