MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Jun 2026
Basil Knipe Electrics · Monta
41 Ballymena Road, BT53 7EX
Rate this charger
Network: Monta
Always check directly with the charge point operator for the most up-to-date information.
Connectors
60 kW2 sockets
Location info
AccessPublic · membership required · access key required
Getting thereLimited opening - 7am-11pm
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Basil Knipe Electrics · Monta?
Up to 60 kW DC via CCS.
How many charging sockets does Basil Knipe Electrics · Monta have?
2 charging sockets: 2 × 60 kW CCS.
Who operates Basil Knipe Electrics · Monta?
Basil Knipe Electrics · Monta is on the Monta network.
How long does a Tesla Model Y Long Range take to charge at Basil Knipe Electrics · Monta?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Basil Knipe Electrics · Monta?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Basil Knipe Electrics · Monta?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 16 Jun 2026