Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 3 of 3VerifiedCowley Manor supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Cowley Manor

Cowley Manor Experimental, GL53 9NL · Open 24h
Rate this charger
Network: Cowley Manor
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW99% reliability3 of 3 available
Bay 1 (New)100% reliabilityAvailable
Bay 2 (New)96% reliabilityAvailable
Bay 3 (New)100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 6pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Cowley Manor?

Up to 22 kW AC via Type 2.

How many charging sockets does Cowley Manor have?

3 charging sockets: 3 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Cowley Manor open 24/7?

Yes - Cowley Manor is open 24 hours a day, 7 days a week.

When is Cowley Manor busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 9 am. The live status on this page shows what is free before you set off.

How reliable is Cowley Manor?

Amp Map measured 98.7% uptime here from recorded live status over the last 30 days, across 24 observed charging sessions.

Who operates Cowley Manor?

Cowley Manor is on the Cowley Manor network.

How long does a Tesla Model Y Long Range take to charge at Cowley Manor?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cowley Manor?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cowley Manor?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Cowley Manor · synced 13 Oct 2026