Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 1 of 4VerifiedPortman Sq Main supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Portman Sq Main

Gloucester Place, W1H 7BG · Open 24h
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW68% reliability1 of 4 available
Square 5100% reliabilityAvailable
Portman Sq 20% reliabilityOut of order
Portman Sq 3100% reliabilityCharging
Portman Sq 4100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Portman Sq Main?

Up to 22 kW AC via Type 2.

How many charging sockets does Portman Sq Main have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Portman Sq Main open 24/7?

Yes - Portman Sq Main is open 24 hours a day, 7 days a week.

When is Portman Sq Main busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Portman Sq Main?

Amp Map measured 67.7% uptime here from recorded live status over the last 30 days, across 36 observed charging sessions.

Who operates Portman Sq Main?

Portman Sq Main is on the Portman Sq Main network.

How long does a Tesla Model Y Long Range take to charge at Portman Sq Main?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Portman Sq Main?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Portman Sq Main?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Portman Sq Main · synced 13 Oct 2026