Romsey Road Car Park · Be.EV
Type 2 · 22 kW100% reliability5 of 5 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 75 kW | £0.87/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.64/kWh |
How much does it cost to charge at Romsey Road Car Park · Be.EV?
The operator's published price is CHAdeMO £0.77/kWh · Type 2 £0.64/kWh · CCS £0.87/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Romsey Road Car Park · Be.EV?
Up to 75 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Romsey Road Car Park · Be.EV have?
7 charging sockets: 1 × 50 kW CHAdeMO, 5 × 22 kW Type 2, 1 × 75 kW CCS. Live per-socket availability is shown on this page.
Is Romsey Road Car Park · Be.EV open 24/7?
Yes - Romsey Road Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Romsey Road Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Romsey Road Car Park · Be.EV?
Amp Map measured 99.6% uptime here from recorded live status over the last 30 days, across 79 observed charging sessions.
Who operates Romsey Road Car Park · Be.EV?
Romsey Road Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Romsey Road Car Park · Be.EV?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Romsey Road Car Park · Be.EV?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Romsey Road Car Park · Be.EV?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.