Lower Trinity Street Car Park · Be.EV
CCS · 150 kW20% reliability0 of 2 available
CHAdeMO · 50 kW58% reliability0 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 150 kW | £0.87/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
| CCS | 50 kW | £0.77/kWh |
How much does it cost to charge at Lower Trinity Street Car Park · Be.EV?
The operator's published price is CHAdeMO £0.77/kWh · CCS £0.77/kWh · CCS £0.87/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Lower Trinity Street Car Park · Be.EV?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Lower Trinity Street Car Park · Be.EV have?
5 charging sockets: 2 × 50 kW CHAdeMO, 1 × 50 kW CCS, 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Lower Trinity Street Car Park · Be.EV open 24/7?
Yes - Lower Trinity Street Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Lower Trinity Street Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Lower Trinity Street Car Park · Be.EV?
Amp Map measured 45% uptime here from recorded live status over the last 30 days, across 137 observed charging sessions.
Who operates Lower Trinity Street Car Park · Be.EV?
Lower Trinity Street Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Lower Trinity Street Car Park · Be.EV?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lower Trinity Street Car Park · Be.EV?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lower Trinity Street Car Park · Be.EV?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.