Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineVerifiedKing Arthur supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

King Arthur

King Arthur Hotel, SA3 1AD · Open 24h
Rate this charger
Network: King Arthur
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
UKEV1087Type 2 · 7 kW100% reliabilityUnavailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
ParkingCar park
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 6am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at King Arthur?

Up to 7 kW AC via Type 2.

How many charging sockets does King Arthur have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is King Arthur open 24/7?

Yes - King Arthur is open 24 hours a day, 7 days a week.

When is King Arthur busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 3 pm. The live status on this page shows what is free before you set off.

How reliable is King Arthur?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 10 observed charging sessions.

Who operates King Arthur?

King Arthur is on the King Arthur network.

How long does a Tesla Model Y Long Range take to charge at King Arthur?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at King Arthur?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at King Arthur?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: King Arthur · synced 13 Oct 2026