Sandbanks Surface Car Park · Be.EV
Type 2 · 22 kW100% reliability3 of 4 available
CCS · 75 kW66% reliability2 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Sandbanks Surface Car Park · Be.EV?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Sandbanks Surface Car Park · Be.EV?
Up to 75 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Sandbanks Surface Car Park · Be.EV have?
8 charging sockets: 4 × 22 kW Type 2, 3 × 75 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Sandbanks Surface Car Park · Be.EV open 24/7?
Yes - Sandbanks Surface Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Sandbanks Surface Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Sandbanks Surface Car Park · Be.EV?
Amp Map measured 74.7% uptime here from recorded live status over the last 30 days, across 157 observed charging sessions.
Who operates Sandbanks Surface Car Park · Be.EV?
Sandbanks Surface Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Sandbanks Surface Car Park · Be.EV?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sandbanks Surface Car Park · Be.EV?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sandbanks Surface Car Park · Be.EV?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.