Leigh Road Car Park · Be.EV
Type 2 · 22 kW0% reliability0 of 2 available
CCS · 50 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Leigh Road Car Park · Be.EV?
The operator's published price is Type 2 £0.59/kWh · CCS £0.77/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Leigh Road Car Park · Be.EV?
Up to 50 kW DC via Type 2, CCS.
How many charging sockets does Leigh Road Car Park · Be.EV have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Leigh Road Car Park · Be.EV open 24/7?
Yes - Leigh Road Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Leigh Road Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Leigh Road Car Park · Be.EV?
Amp Map measured 44% uptime here from recorded live status over the last 30 days, across 84 observed charging sessions.
Who operates Leigh Road Car Park · Be.EV?
Leigh Road Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Leigh Road Car Park · Be.EV?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Leigh Road Car Park · Be.EV?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Leigh Road Car Park · Be.EV?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.