Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 8 of 10VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

West Bay Road Car Park · Be.EV

West Bay Road Car Park, DT6 4EL
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW100% reliability2 of 2 available
AD00106-1100% reliabilityAvailable
AD00106-2100% reliabilityAvailable
CCS · 300 kW97% reliability0 of 2 available
ALP0018-197% reliabilityOut of order
ALP0018-297% reliabilityOut of order
CCS · 50 kW100% reliability6 of 6 available
ALW0063-1100% reliabilityAvailable
ALW0063-2100% reliabilityAvailable
ALW0064-1100% reliabilityAvailable
ALW0064-2100% reliabilityAvailable
KM0043-01100% reliabilityAvailable
KM0043-02100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
Facilities
Car park
6am9am12pm3pm6pm9pm
From live status history · busiest around 11am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at West Bay Road Car Park · Be.EV?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at West Bay Road Car Park · Be.EV?

Up to 300 kW DC via CCS, Type 2.

How many charging sockets does West Bay Road Car Park · Be.EV have?

10 charging sockets: 6 × 50 kW CCS, 2 × 300 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is West Bay Road Car Park · Be.EV open 24/7?

Yes - West Bay Road Car Park · Be.EV is open 24 hours a day, 7 days a week.

When is West Bay Road Car Park · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is West Bay Road Car Park · Be.EV?

Amp Map measured 99.5% uptime here from recorded live status over the last 30 days, across 356 observed charging sessions.

Who operates West Bay Road Car Park · Be.EV?

West Bay Road Car Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at West Bay Road Car Park · Be.EV?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West Bay Road Car Park · Be.EV?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at West Bay Road Car Park · Be.EV?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026