IONITY GmbH IONITY Hull VH
CCS · 350 kW98% reliability5 of 8 available
CCS · 50 kW100% reliability1 of 2 available
CCS · 400 kW99% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 400 kW | £0.83/kWh |
| CCS | 350 kW | £0.83/kWh |
| CCS | 50 kW | £0.62/kWh |
How much does it cost to charge at IONITY GmbH IONITY Hull VH?
The operator's published price is CCS £0.83/kWh · CCS £0.62/kWh · CCS £0.83/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at IONITY GmbH IONITY Hull VH?
Up to 400 kW DC via CCS.
How many charging sockets does IONITY GmbH IONITY Hull VH have?
12 charging sockets: 8 × 350 kW CCS, 2 × 50 kW CCS, 2 × 400 kW CCS. Live per-socket availability is shown on this page.
Is IONITY GmbH IONITY Hull VH open 24/7?
Yes - IONITY GmbH IONITY Hull VH is open 24 hours a day, 7 days a week.
When is IONITY GmbH IONITY Hull VH busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is IONITY GmbH IONITY Hull VH?
Amp Map measured 98.7% uptime here from recorded live status over the last 30 days, across 852 observed charging sessions.
Who operates IONITY GmbH IONITY Hull VH?
IONITY GmbH IONITY Hull VH is on the IONITY network.
How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Hull VH?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Hull VH?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Hull VH?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.