IONITY GmbH IONITY Birmingham (Aston South)
CCS · 200 kW100% reliability12 of 12 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at IONITY GmbH IONITY Birmingham (Aston South)?
The operator's published price is £0.83/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at IONITY GmbH IONITY Birmingham (Aston South)?
Up to 200 kW DC via CCS.
How many charging sockets does IONITY GmbH IONITY Birmingham (Aston South) have?
12 charging sockets: 12 × 200 kW CCS. Live per-socket availability is shown on this page.
Is IONITY GmbH IONITY Birmingham (Aston South) open 24/7?
Yes - IONITY GmbH IONITY Birmingham (Aston South) is open 24 hours a day, 7 days a week.
When is IONITY GmbH IONITY Birmingham (Aston South) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is IONITY GmbH IONITY Birmingham (Aston South)?
Amp Map measured 99.7% uptime here from recorded live status over the last 30 days, across 418 observed charging sessions.
Who operates IONITY GmbH IONITY Birmingham (Aston South)?
IONITY GmbH IONITY Birmingham (Aston South) is on the IONITY network.
How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Birmingham (Aston South)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Birmingham (Aston South)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Birmingham (Aston South)?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.