Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Mar 2023

Rusdene Services · InstaVolt Ltd

Broom Way, PO13 9JP
Rate this charger
Network: InstaVolt Ltd
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW2 sockets
CCS50 kW2 sockets
Location info
Price£0.75/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
Getting thereThis station can be found within the Lee On Solent petrol station forecourt and is located on the left hand side after the car park entrance.
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Rusdene Services · InstaVolt Ltd?

The operator's published price is £0.75/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Rusdene Services · InstaVolt Ltd?

Up to 50 kW DC via CHAdeMO, CCS.

How many charging sockets does Rusdene Services · InstaVolt Ltd have?

2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.

Who operates Rusdene Services · InstaVolt Ltd?

Rusdene Services · InstaVolt Ltd is on the InstaVolt Ltd network.

How long does a Tesla Model Y Long Range take to charge at Rusdene Services · InstaVolt Ltd?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rusdene Services · InstaVolt Ltd?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Rusdene Services · InstaVolt Ltd?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 Mar 2023