Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Aug 2024

Biggleswade, Normandy Lane · Source EV

Normandy Lane, SG18 8QB · Open 24h
Rate this charger
Network: Source EV
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CCSDC · cable150 kW£0.89/kWh10 sockets
Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
AccessPublic · pay at location
PaymentCredit cardApp start/stopRFID card
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Biggleswade, Normandy Lane · Source EV?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Biggleswade, Normandy Lane · Source EV?

Up to 150 kW DC via CCS.

How many charging sockets does Biggleswade, Normandy Lane · Source EV have?

10 charging sockets: 10 × 150 kW CCS.

Is Biggleswade, Normandy Lane · Source EV open 24/7?

Yes - Biggleswade, Normandy Lane · Source EV is open 24 hours a day, 7 days a week.

Who operates Biggleswade, Normandy Lane · Source EV?

Biggleswade, Normandy Lane · Source EV is on the Source EV network.

How long does a Tesla Model Y Long Range take to charge at Biggleswade, Normandy Lane · Source EV?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Biggleswade, Normandy Lane · Source EV?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Biggleswade, Normandy Lane · Source EV?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 Aug 2024