Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 14 Mar 2024

Colbourne Street · InstaVolt Ltd

Colbourne Street, SN1 2EQ
Rate this charger
Network: InstaVolt Ltd
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW1 socket
CCS50 kW1 socket
CHAdeMO50 kW1 socket
CCS50 kW1 socket
CCS160 kW1 socket
CHAdeMO60 kW1 socket
CCS160 kW1 socket
CHAdeMO60 kW1 socket
CCS160 kW1 socket
CHAdeMO60 kW1 socket
Location info
Price£0.75/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · pay at location
Getting thereIn B&M car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Colbourne Street · InstaVolt Ltd?

The operator's published price is £0.75/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Colbourne Street · InstaVolt Ltd?

Up to 160 kW DC via CHAdeMO, CCS.

How many charging sockets does Colbourne Street · InstaVolt Ltd have?

5 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 160 kW CCS, 1 × 60 kW CHAdeMO, 1 × 160 kW CCS, 1 × 60 kW CHAdeMO, 1 × 160 kW CCS, 1 × 60 kW CHAdeMO.

Who operates Colbourne Street · InstaVolt Ltd?

Colbourne Street · InstaVolt Ltd is on the InstaVolt Ltd network.

How long does a Tesla Model Y Long Range take to charge at Colbourne Street · InstaVolt Ltd?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Colbourne Street · InstaVolt Ltd?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Colbourne Street · InstaVolt Ltd?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 160 kW CCS~26 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 160 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 160 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 160 kW CCS~22 min
MG Motor MG4 Trophy 10–80% · 160 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 160 kW CCS~39 min
Nissan LEAF 10–80% · 60 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 14 Mar 2024