Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 13 Oct 2020

Market Hill Car Park · Hubsta

78 Market Pl, YO43 3AW
Rate this charger
Network: Hubsta
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW2 sockets
Location info
Price£0.30p per kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
Notes£0.30p per kWh inc VAT when a member of the Hubsta Network. £0.30p per kWH inc VAT for Pay as you go, Third party schemes & roaming networks. However rates may change so please check with your e-mobility provider for up to date pricing.
Getting thereHubsta Dual 7kW charging station with power share enabled. Vehicle may charge slower when two vehicles are charging. www.hubsta.co.uk
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Market Hill Car Park · Hubsta?

The operator's published price is £0.30p per kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Market Hill Car Park · Hubsta?

Up to 7 kW AC via Type 2.

How many charging sockets does Market Hill Car Park · Hubsta have?

1 charging socket: 2 × 7 kW Type 2.

Who operates Market Hill Car Park · Hubsta?

Market Hill Car Park · Hubsta is on the Hubsta network. For site issues, the operator lists +44 800 954 0091.

How long does a Tesla Model Y Long Range take to charge at Market Hill Car Park · Hubsta?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Market Hill Car Park · Hubsta?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Market Hill Car Park · Hubsta?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 13 Oct 2020