Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Oct 2020

Bradford Council, Keighley · Hubsta

Bronte Drive, BD22 7LZ
Rate this charger
Network: Hubsta
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW3 sockets
Location info
Price50p connection fee and around 20p kWh.
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessCustomers only
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Bradford Council, Keighley · Hubsta?

The operator's published price is 50p connection fee and around 20p kWh.. Prices come from the operator's own data feed and can change.

How fast is charging at Bradford Council, Keighley · Hubsta?

Up to 7 kW AC via Type 2.

How many charging sockets does Bradford Council, Keighley · Hubsta have?

3 charging sockets: 3 × 7 kW Type 2.

Who operates Bradford Council, Keighley · Hubsta?

Bradford Council, Keighley · Hubsta is on the Hubsta network.

Can anyone charge at Bradford Council, Keighley · Hubsta?

The operator lists this charger for customers of the site.

How long does a Tesla Model Y Long Range take to charge at Bradford Council, Keighley · Hubsta?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bradford Council, Keighley · Hubsta?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bradford Council, Keighley · Hubsta?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Oct 2020