Heywood Civic Centre · Be.EV
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | £0.77/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at Heywood Civic Centre · Be.EV?
The operator's published price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Heywood Civic Centre · Be.EV?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Heywood Civic Centre · Be.EV have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is Heywood Civic Centre · Be.EV open 24/7?
Yes - Heywood Civic Centre · Be.EV is open 24 hours a day, 7 days a week.
When is Heywood Civic Centre · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Heywood Civic Centre · Be.EV?
Amp Map measured 93.4% uptime here from recorded live status over the last 30 days, across 188 observed charging sessions.
Who operates Heywood Civic Centre · Be.EV?
Heywood Civic Centre · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Heywood Civic Centre · Be.EV?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Heywood Civic Centre · Be.EV?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Heywood Civic Centre · Be.EV?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.