MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 May 2023
Hereford Council Offices Plough Lane Her
Plough Lane, HR4 0LE
Rate this charger
Connectors
7 kW1 socket
7 kW1 socket
Location info
AccessPublic · membership required · access key required
Getting thereTurn left before Scottish and Newcastle site. Drive through first car park into second area for staff and visitors. At far end of car park opposite entrance.
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Hereford Council Offices Plough Lane Her?
Up to 7 kW AC via Type 2.
How many charging sockets does Hereford Council Offices Plough Lane Her have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
How long does a Tesla Model Y Long Range take to charge at Hereford Council Offices Plough Lane Her?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hereford Council Offices Plough Lane Her?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hereford Council Offices Plough Lane Her?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 4 May 2023