HU - Wheatley Doncaster · GRIDSERVE
CCS · 180 kW67% reliability3 of 5 available
Type 2 · 22 kW100% reliability6 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 180 kW | £0.85/kWh |
| CHAdeMO | 80 kW | £0.85/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at HU - Wheatley Doncaster · GRIDSERVE?
The operator's published price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at HU - Wheatley Doncaster · GRIDSERVE?
Up to 180 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does HU - Wheatley Doncaster · GRIDSERVE have?
12 charging sockets: 5 × 180 kW CCS, 1 × 80 kW CHAdeMO, 6 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is HU - Wheatley Doncaster · GRIDSERVE open 24/7?
Yes - HU - Wheatley Doncaster · GRIDSERVE is open 24 hours a day, 7 days a week.
When is HU - Wheatley Doncaster · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is HU - Wheatley Doncaster · GRIDSERVE?
Amp Map measured 96.6% uptime here from recorded live status over the last 30 days, across 96 observed charging sessions.
Who operates HU - Wheatley Doncaster · GRIDSERVE?
HU - Wheatley Doncaster · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at HU - Wheatley Doncaster · GRIDSERVE?
A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Wheatley Doncaster · GRIDSERVE?
A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HU - Wheatley Doncaster · GRIDSERVE?
A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.