Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 10 of 12VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 29 Oct 2026

HU - Wheatley Doncaster · GRIDSERVE

Wheatley Centre Shopping Park, DN2 4PE · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 180 kW67% reliability3 of 5 available
#165% reliabilityOut of order
#26% reliabilityOut of order
#368% reliabilityAvailable
#587% reliabilityAvailable
#699% reliabilityAvailable
#4CHAdeMO · 80 kW99% reliabilityAvailable
Type 2 · 22 kW100% reliability6 of 6 available
#7100% reliabilityAvailable
#8100% reliabilityAvailable
#9100% reliabilityAvailable
#10100% reliabilityAvailable
#11100% reliabilityAvailable
#12100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS180 kW£0.85/kWh
CHAdeMO80 kW£0.85/kWh
Type 222 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Facilities
CaféShoppingSupermarket
6am9am12pm3pm6pm9pm
From live status history · busiest around 6pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at HU - Wheatley Doncaster · GRIDSERVE?

The operator's published price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at HU - Wheatley Doncaster · GRIDSERVE?

Up to 180 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does HU - Wheatley Doncaster · GRIDSERVE have?

12 charging sockets: 5 × 180 kW CCS, 1 × 80 kW CHAdeMO, 6 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is HU - Wheatley Doncaster · GRIDSERVE open 24/7?

Yes - HU - Wheatley Doncaster · GRIDSERVE is open 24 hours a day, 7 days a week.

When is HU - Wheatley Doncaster · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Wheatley Doncaster · GRIDSERVE?

Amp Map measured 96.6% uptime here from recorded live status over the last 30 days, across 96 observed charging sessions.

Who operates HU - Wheatley Doncaster · GRIDSERVE?

HU - Wheatley Doncaster · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at HU - Wheatley Doncaster · GRIDSERVE?

A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Wheatley Doncaster · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Wheatley Doncaster · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 180 kW CCS~24 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 180 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 180 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 180 kW CCS~20 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 180 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 180 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 29 Oct 2026