EH - Welcome Break Abington · GRIDSERVE
CCS · 45 kW100% reliability1 of 2 available
CHAdeMO · 50 kW100% reliability2 of 2 available
Type 2 · 22 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at EH - Welcome Break Abington · GRIDSERVE?
The operator's published price is £0.92/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at EH - Welcome Break Abington · GRIDSERVE?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - Welcome Break Abington · GRIDSERVE have?
6 charging sockets: 2 × 45 kW CCS, 2 × 50 kW CHAdeMO, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is EH - Welcome Break Abington · GRIDSERVE open 24/7?
Yes - EH - Welcome Break Abington · GRIDSERVE is open 24 hours a day, 7 days a week.
When is EH - Welcome Break Abington · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - Welcome Break Abington · GRIDSERVE?
Amp Map measured 99.6% uptime here from recorded live status over the last 30 days, across 419 observed charging sessions.
Who operates EH - Welcome Break Abington · GRIDSERVE?
EH - Welcome Break Abington · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at EH - Welcome Break Abington · GRIDSERVE?
A typical 10–80% rapid charge takes about 78 min on the 45 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Welcome Break Abington · GRIDSERVE?
A typical 10–80% rapid charge takes about 56 min on the 45 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - Welcome Break Abington · GRIDSERVE?
A typical 10–80% rapid charge takes about 73 min on the 45 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.