EH - Roadchef Annandale Water · GRIDSERVE
CCS / CHAdeMO · 350 kW100% reliability0 of 3 available
CCS · 350 kW100% reliability0 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at EH - Roadchef Annandale Water · GRIDSERVE?
The operator's published price is £0.92/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at EH - Roadchef Annandale Water · GRIDSERVE?
Up to 350 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - Roadchef Annandale Water · GRIDSERVE have?
9 charging sockets: 1 × 40 kW CCS, 1 × 40 kW CHAdeMO, 1 × 22 kW Type 2, 6 × 350 kW CCS, 3 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is EH - Roadchef Annandale Water · GRIDSERVE open 24/7?
Yes - EH - Roadchef Annandale Water · GRIDSERVE is open 24 hours a day, 7 days a week.
When is EH - Roadchef Annandale Water · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - Roadchef Annandale Water · GRIDSERVE?
Amp Map measured 99.7% uptime here from recorded live status over the last 30 days, across 2440 observed charging sessions.
Who operates EH - Roadchef Annandale Water · GRIDSERVE?
EH - Roadchef Annandale Water · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at EH - Roadchef Annandale Water · GRIDSERVE?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Roadchef Annandale Water · GRIDSERVE?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - Roadchef Annandale Water · GRIDSERVE?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.