EH - MOTO Stirling · GRIDSERVE
CCS · 225 kW100% reliability5 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 225 kW | £0.92/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at EH - MOTO Stirling · GRIDSERVE?
The operator's published price is Type 2 £0.59/kWh · CCS £0.92/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at EH - MOTO Stirling · GRIDSERVE?
Up to 225 kW DC via Type 2, CCS.
How many charging sockets does EH - MOTO Stirling · GRIDSERVE have?
7 charging sockets: 1 × 11 kW Type 2, 6 × 225 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Stirling · GRIDSERVE open 24/7?
Yes - EH - MOTO Stirling · GRIDSERVE is open 24 hours a day, 7 days a week.
When is EH - MOTO Stirling · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Stirling · GRIDSERVE?
Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 961 observed charging sessions.
Who operates EH - MOTO Stirling · GRIDSERVE?
EH - MOTO Stirling · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Stirling · GRIDSERVE?
A typical 10–80% rapid charge takes about 22 min on the 225 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Stirling · GRIDSERVE?
A typical 10–80% rapid charge takes about 23 min on the 225 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Stirling · GRIDSERVE?
A typical 10–80% rapid charge takes about 39 min on the 225 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.