Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 23 of 36VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

EH - M6 Rugby Services moto · GRIDSERVE

Junction 1, CV23 0EZ · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 360 kW96% reliability23 of 36 available
#199% reliabilityCharging
#2100% reliabilityAvailable
#3100% reliabilityCharging
#499% reliabilityCharging
#5100% reliabilityCharging
#6100% reliabilityAvailable
#7100% reliabilityCharging
#8100% reliabilityAvailable
#999% reliabilityAvailable
#10100% reliabilityCharging
#11100% reliabilityAvailable
#12100% reliabilityAvailable
#13100% reliabilityAvailable
#1499% reliabilityAvailable
#1599% reliabilityAvailable
#16100% reliabilityCharging
#1796% reliabilityAvailable
#18100% reliabilityAvailable
#19100% reliabilityAvailable
#20100% reliabilityCharging
#21100% reliabilityAvailable
#22100% reliabilityAvailable
#23100% reliabilityAvailable
#24100% reliabilityAvailable
#2534% reliabilityAvailable
#2644% reliabilityCharging
#27100% reliabilityAvailable
#28100% reliabilityAvailable
#29100% reliabilityAvailable
#30100% reliabilityCharging
#31100% reliabilityAvailable
#32100% reliabilityCharging
#33100% reliabilityAvailable
#3499% reliabilityCharging
#3598% reliabilityAvailable
#36100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.92/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOther
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at EH - M6 Rugby Services moto · GRIDSERVE?

The operator's published price is £0.92/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at EH - M6 Rugby Services moto · GRIDSERVE?

Up to 360 kW DC via CCS.

How many charging sockets does EH - M6 Rugby Services moto · GRIDSERVE have?

36 charging sockets: 36 × 360 kW CCS. Live per-socket availability is shown on this page.

Is EH - M6 Rugby Services moto · GRIDSERVE open 24/7?

Yes - EH - M6 Rugby Services moto · GRIDSERVE is open 24 hours a day, 7 days a week.

When is EH - M6 Rugby Services moto · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - M6 Rugby Services moto · GRIDSERVE?

Amp Map measured 96.3% uptime here from recorded live status over the last 30 days, across 7374 observed charging sessions.

Who operates EH - M6 Rugby Services moto · GRIDSERVE?

EH - M6 Rugby Services moto · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at EH - M6 Rugby Services moto · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - M6 Rugby Services moto · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - M6 Rugby Services moto · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 360 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 360 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 360 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 360 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 360 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 360 kW CCS~39 min · ≈ 41 kWh · ~£37

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026