Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 8 of 16VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

EH - MOTO Pease Pottage · GRIDSERVE

Brighton Rd, RH11 9YA · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 50 kW0 of 3 available
#1Unavailable
#3Unavailable
#4Unavailable
#2CHAdeMO · 50 kWUnavailable
CCS · 350 kW100% reliability5 of 7 available
#5100% reliabilityAvailable
#6100% reliabilityAvailable
#7100% reliabilityCharging
#13100% reliabilityAvailable
#14100% reliabilityCharging
#15100% reliabilityAvailable
#16100% reliabilityAvailable
CCS / CHAdeMO · 350 kW100% reliability3 of 5 available
#8100% reliabilityAvailable
#9100% reliabilityAvailable
#10100% reliabilityCharging
#11100% reliabilityCharging
#12100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.92/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Getting thereTo the right of Burger King.
Facilities
RestaurantCaféShoppingSupermarketFuel stationWi-Fi
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at EH - MOTO Pease Pottage · GRIDSERVE?

The operator's published price is £0.92/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at EH - MOTO Pease Pottage · GRIDSERVE?

Up to 350 kW DC via CCS, CHAdeMO.

How many charging sockets does EH - MOTO Pease Pottage · GRIDSERVE have?

16 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 12 × 350 kW CCS, 5 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is EH - MOTO Pease Pottage · GRIDSERVE open 24/7?

Yes - EH - MOTO Pease Pottage · GRIDSERVE is open 24 hours a day, 7 days a week.

When is EH - MOTO Pease Pottage · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Pease Pottage · GRIDSERVE?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 3022 observed charging sessions.

Who operates EH - MOTO Pease Pottage · GRIDSERVE?

EH - MOTO Pease Pottage · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Pease Pottage · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Pease Pottage · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Pease Pottage · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026