EH - IKEA Wembley · GRIDSERVE
CCS · 40 kW100% reliability2 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 40 kW | £0.85/kWh |
| CHAdeMO | 40 kW | £0.85/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at EH - IKEA Wembley · GRIDSERVE?
The operator's published price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at EH - IKEA Wembley · GRIDSERVE?
Up to 40 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - IKEA Wembley · GRIDSERVE have?
5 charging sockets: 3 × 40 kW CCS, 1 × 40 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is EH - IKEA Wembley · GRIDSERVE open 24/7?
Yes - EH - IKEA Wembley · GRIDSERVE is open 24 hours a day, 7 days a week.
When is EH - IKEA Wembley · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - IKEA Wembley · GRIDSERVE?
Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 327 observed charging sessions.
Who operates EH - IKEA Wembley · GRIDSERVE?
EH - IKEA Wembley · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at EH - IKEA Wembley · GRIDSERVE?
A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - IKEA Wembley · GRIDSERVE?
A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - IKEA Wembley · GRIDSERVE?
A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.