eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway
CCS · 350 kW100% reliability12 of 12 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
Up to 350 kW DC via CCS.
How many charging sockets does eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway have?
12 charging sockets: 12 × 350 kW CCS. Live per-socket availability is shown on this page.
Is eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway open 24/7?
Yes - eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway is open 24 hours a day, 7 days a week.
When is eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 34 observed charging sessions.
Who operates eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway is on the GRIDSERVE Electric Freightway network.
How long does a Tesla Model Y Long Range take to charge at eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at eHGV - MOTO Tamworth · GRIDSERVE Electric Freightway?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.