Gatwick Electric Forecourt · GRIDSERVE
CCS · 350 kW89% reliability15 of 16 available
CCS / CHAdeMO · 350 kW100% reliability4 of 6 available
Type 2 · 11 kW100% reliability1 of 3 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 350 kW | £0.85/kWh |
| CHAdeMO | 100 kW | £0.85/kWh |
| Type 2 | 22 kW | £0.59/kWh |
| Type 2 | 11 kW | £0.59/kWh |
How much does it cost to charge at Gatwick Electric Forecourt · GRIDSERVE?
The operator's published price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Gatwick Electric Forecourt · GRIDSERVE?
Up to 350 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Gatwick Electric Forecourt · GRIDSERVE have?
26 charging sockets: 22 × 350 kW CCS, 6 × 100 kW CHAdeMO, 1 × 22 kW Type 2, 3 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is Gatwick Electric Forecourt · GRIDSERVE open 24/7?
Yes - Gatwick Electric Forecourt · GRIDSERVE is open 24 hours a day, 7 days a week.
When is Gatwick Electric Forecourt · GRIDSERVE busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Gatwick Electric Forecourt · GRIDSERVE?
Amp Map measured 92.8% uptime here from recorded live status over the last 30 days, across 4595 observed charging sessions.
Who operates Gatwick Electric Forecourt · GRIDSERVE?
Gatwick Electric Forecourt · GRIDSERVE is on the GRIDSERVE network.
How long does a Tesla Model Y Long Range take to charge at Gatwick Electric Forecourt · GRIDSERVE?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gatwick Electric Forecourt · GRIDSERVE?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Gatwick Electric Forecourt · GRIDSERVE?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.