Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 25 of 32VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

EH - MOTO Ferrybridge · GRIDSERVE

M62-A1M Jct 33, WF11 0AF · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 50 kW99% reliability4 of 4 available
#199% reliabilityAvailable
#4100% reliabilityAvailable
#798% reliabilityAvailable
#8100% reliabilityAvailable
CHAdeMO · 50 kW98% reliability2 of 2 available
#2100% reliabilityAvailable
#596% reliabilityAvailable
Type 2 · 22 kW100% reliability2 of 2 available
#3100% reliabilityAvailable
#6100% reliabilityAvailable
CCS · 350 kW100% reliability5 of 6 available
#9100% reliabilityAvailable
#10100% reliabilityAvailable
#11100% reliabilityAvailable
#18100% reliabilityCharging
#19100% reliabilityAvailable
#20100% reliabilityAvailable
CCS / CHAdeMO · 350 kW100% reliability3 of 6 available
#12100% reliabilityAvailable
#13100% reliabilityCharging
#1499% reliabilityCharging
#15100% reliabilityAvailable
#1699% reliabilityCharging
#17100% reliabilityAvailable
CCS · 360 kW99% reliability9 of 12 available
#21100% reliabilityAvailable
#22100% reliabilityCharging
#2399% reliabilityAvailable
#24100% reliabilityCharging
#25100% reliabilityAvailable
#26100% reliabilityAvailable
#27100% reliabilityAvailable
#28100% reliabilityCharging
#2998% reliabilityAvailable
#3089% reliabilityAvailable
#3199% reliabilityAvailable
#32100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.92/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Getting thereTo the right of entrance to Travelodge building.
Facilities
HotelRestaurantCaféShoppingFuel stationWi-Fi
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at EH - MOTO Ferrybridge · GRIDSERVE?

The operator's published price is £0.92/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at EH - MOTO Ferrybridge · GRIDSERVE?

Up to 360 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - MOTO Ferrybridge · GRIDSERVE have?

32 charging sockets: 4 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 22 kW Type 2, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 12 × 360 kW CCS. Live per-socket availability is shown on this page.

Is EH - MOTO Ferrybridge · GRIDSERVE open 24/7?

Yes - EH - MOTO Ferrybridge · GRIDSERVE is open 24 hours a day, 7 days a week.

When is EH - MOTO Ferrybridge · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Ferrybridge · GRIDSERVE?

Amp Map measured 99.1% uptime here from recorded live status over the last 30 days, across 4579 observed charging sessions.

Who operates EH - MOTO Ferrybridge · GRIDSERVE?

EH - MOTO Ferrybridge · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Ferrybridge · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Ferrybridge · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Ferrybridge · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 360 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 360 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 360 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 360 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 360 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 360 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026