Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 6VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

HU - Dobbies Peterborough · GRIDSERVE

Phorpres Way, PE7 8NY
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 350 kW36% reliability3 of 4 available
#135% reliabilityAvailable
#239% reliabilityCharging
#337% reliabilityAvailable
#436% reliabilityAvailable
CCS / CHAdeMO · 350 kW35% reliability2 of 2 available
#536% reliabilityAvailable
#634% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.85/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursMon–Wed 09:00–17:45Thu 09:00–18:45Fri–Sat 09:00–17:45Sun 10:30–16:15
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Facilities
HotelRestaurantCaféShoppingBus stopFuel station
6am9am12pm3pm6pm9pm
From live status history · busiest around 11pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at HU - Dobbies Peterborough · GRIDSERVE?

The operator's published price is £0.85/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at HU - Dobbies Peterborough · GRIDSERVE?

Up to 350 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Dobbies Peterborough · GRIDSERVE have?

6 charging sockets: 6 × 350 kW CCS, 2 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

When is HU - Dobbies Peterborough · GRIDSERVE open?

Opening hours: Mon–Wed 09:00–17:45; Thu 09:00–18:45; Fri–Sat 09:00–17:45; Sun 10:30–16:15.

When is HU - Dobbies Peterborough · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is HU - Dobbies Peterborough · GRIDSERVE?

Amp Map measured 36% uptime here from recorded live status over the last 30 days, across 223 observed charging sessions.

Who operates HU - Dobbies Peterborough · GRIDSERVE?

HU - Dobbies Peterborough · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at HU - Dobbies Peterborough · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Dobbies Peterborough · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Dobbies Peterborough · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026