Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineVerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

HU - Dobbies Edinburgh · GRIDSERVE

Melville Nursery, EH18 1AZ · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 350 kW0 of 2 available
#1Unavailable
#2Unavailable
CCS · 120 kW0 of 4 available
#3Unavailable
#4Unavailable
#5Unavailable
#6Unavailable
Location info
Price£0.85/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Facilities
HotelRestaurantCaféNatureBus stop
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at HU - Dobbies Edinburgh · GRIDSERVE?

The operator's published price is £0.85/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at HU - Dobbies Edinburgh · GRIDSERVE?

Up to 350 kW DC via CCS.

How many charging sockets does HU - Dobbies Edinburgh · GRIDSERVE have?

6 charging sockets: 2 × 350 kW CCS, 4 × 120 kW CCS. Live per-socket availability is shown on this page.

Is HU - Dobbies Edinburgh · GRIDSERVE open 24/7?

Yes - HU - Dobbies Edinburgh · GRIDSERVE is open 24 hours a day, 7 days a week.

Who operates HU - Dobbies Edinburgh · GRIDSERVE?

HU - Dobbies Edinburgh · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at HU - Dobbies Edinburgh · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Dobbies Edinburgh · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Dobbies Edinburgh · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min · ≈ 41 kWh · ~£35

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026