Keel Row · Fastned
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Keel Row · Fastned?
The operator's published price is £0.79/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Keel Row · Fastned?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Keel Row · Fastned have?
2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 38 kW Type 2, 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Keel Row · Fastned open 24/7?
Yes - Keel Row · Fastned is open 24 hours a day, 7 days a week.
When is Keel Row · Fastned busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Keel Row · Fastned?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 237 observed charging sessions.
Who operates Keel Row · Fastned?
Keel Row · Fastned is on the Fastned network.
How long does a Tesla Model Y Long Range take to charge at Keel Row · Fastned?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Keel Row · Fastned?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Keel Row · Fastned?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.