Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 6VerifiedFastned supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Freebridge King's Lynn · Fastned

Clenchwarton Road, LE34 3LW · Open 24h
Rate this charger
Network: Fastned
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
4406901CCS / CHAdeMO · 400 kW100% reliabilityCharging
CCS · 400 kW97% reliability4 of 4 available
440690288% reliabilityAvailable
4406906100% reliabilityAvailable
4406907100% reliabilityAvailable
4406908100% reliabilityAvailable
4406905CHAdeMO / CCS · 400 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.79/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
Energy100% renewable energy
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Freebridge King's Lynn · Fastned?

The operator's published price is £0.79/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Freebridge King's Lynn · Fastned?

Up to 400 kW DC via CCS, CHAdeMO.

How many charging sockets does Freebridge King's Lynn · Fastned have?

6 charging sockets: 6 × 400 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Freebridge King's Lynn · Fastned open 24/7?

Yes - Freebridge King's Lynn · Fastned is open 24 hours a day, 7 days a week.

When is Freebridge King's Lynn · Fastned busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Freebridge King's Lynn · Fastned?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 735 observed charging sessions.

Who operates Freebridge King's Lynn · Fastned?

Freebridge King's Lynn · Fastned is on the Fastned network.

How long does a Tesla Model Y Long Range take to charge at Freebridge King's Lynn · Fastned?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Freebridge King's Lynn · Fastned?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Freebridge King's Lynn · Fastned?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 13 Oct 2026