Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 10 of 12VerifiedFastned supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Banbridge The Boulevard · Fastned

The Boulevard, BT32 4GL · Open 24h
Rate this charger
Network: Fastned
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 400 kW100% reliability8 of 10 available
4406301100% reliabilityAvailable
4406302100% reliabilityCharging
4406303100% reliabilityAvailable
4406305100% reliabilityAvailable
4406306100% reliabilityAvailable
4406307100% reliabilityAvailable
4406309100% reliabilityCharging
4406310100% reliabilityAvailable
4406311100% reliabilityAvailable
4406312100% reliabilityAvailable
4406304CCS / CHAdeMO · 400 kW100% reliabilityAvailable
4406308CHAdeMO / CCS · 400 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.79/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
Energy100% renewable energy
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Banbridge The Boulevard · Fastned?

The operator's published price is £0.79/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Banbridge The Boulevard · Fastned?

Up to 400 kW DC via CCS, CHAdeMO.

How many charging sockets does Banbridge The Boulevard · Fastned have?

12 charging sockets: 12 × 400 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Banbridge The Boulevard · Fastned open 24/7?

Yes - Banbridge The Boulevard · Fastned is open 24 hours a day, 7 days a week.

When is Banbridge The Boulevard · Fastned busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Banbridge The Boulevard · Fastned?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1592 observed charging sessions.

Who operates Banbridge The Boulevard · Fastned?

Banbridge The Boulevard · Fastned is on the Fastned network.

How long does a Tesla Model Y Long Range take to charge at Banbridge The Boulevard · Fastned?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Banbridge The Boulevard · Fastned?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Banbridge The Boulevard · Fastned?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£32
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Data: Fastned · synced 13 Oct 2026