MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 15 Sept 2025
George Canning Spar Bellarena · EZO (IE)
436 Seacoast Rd, BT49 0LD
Rate this charger
Network: EZO (IE)
Always check directly with the charge point operator for the most up-to-date information.
Connectors
47 kW2 sockets
Location info
AccessPublic · membership required · access key required
Find itStreet View of this spot ↗
Facilities
SupermarketSpar
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at George Canning Spar Bellarena · EZO (IE)?
Up to 47 kW DC via CCS.
How many charging sockets does George Canning Spar Bellarena · EZO (IE) have?
2 charging sockets: 2 × 47 kW CCS.
Who operates George Canning Spar Bellarena · EZO (IE)?
George Canning Spar Bellarena · EZO (IE) is on the EZO (IE) network.
How long does a Tesla Model Y Long Range take to charge at George Canning Spar Bellarena · EZO (IE)?
A typical 10–80% rapid charge takes about 74 min on the 47 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at George Canning Spar Bellarena · EZO (IE)?
A typical 10–80% rapid charge takes about 54 min on the 47 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at George Canning Spar Bellarena · EZO (IE)?
A typical 10–80% rapid charge takes about 70 min on the 47 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 47 kW CCS~74 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 47 kW CCS~54 min
Audi Q4 e-tron 50 10–80% · 47 kW CCS~70 min
Hyundai IONIQ 5 10–80% · 47 kW CCS~68 min
MG Motor MG4 Trophy 10–80% · 47 kW CCS~58 min
Hyundai Kona Electric Long Range 10–80% · 47 kW CCS~58 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 15 Sept 2025